River Pile Moorings
There are a number of pile moorings in the river Medina however these are reaching the end of their useful life, and are gradually being replaced by pontoon moorings in accordance with demand. Wait times for these moorings vary greatly due to the need to ‘pair’ suitable vessels together. Licence period: 1st Jan – 31st Dec

2013 Charges
| River Pile Annual Mooring | ||
|---|---|---|
| 2013 – inclusive of harbour dues and VAT | £50.83 | per metre |
A mooring application form can be downloaded here: